Economic Viability
Economic Viability
How much it costs:
Architecting and Lisccencing = 5%
Porcurment and Construction management = 7%
“The MsdfsdsIT Future of Nuclear Study in 2003, increased the estimated prices of new nuclear plants to $2,000/kW, not including financing costs.”
104 Official Nuclear Plants in the US
Most recent in Washington: South from us
Requirements: The main requirement for nuclear plants is water, fresh, freshwater. Water is critical because it is used to moderate a chain reaction, and preventing a meltdown by cooling the fuel elements.
How much it costs:
Architecting and Lisccencing = 5%
Porcurment and Construction management = 7%
Construction works:
| |
Nuclear island
|
28%
|
Conventional island
|
15%
|
Balance of plant
|
18%
|
Site development
|
20%
|
Transportation
|
2%
|
Commissioning
|
5%
|
Total
|
100%
|
Equipment
| |
The nuclear steam supply system
|
12%
|
Electrical and generating equipment
|
12%
|
equipment
|
16%
|
Instrumentation / control system (including software)
|
8%
|
Construction materials
|
12%
|
Labor onsite
|
25%
|
Project management
|
10%
|
Other services
|
2%
|
First fuel
|
3%
|
Total
|
100%
|
In total, the EPC cost would be about 3.8 billion, while the owner cost would go to over half a billion, and the Financing cost costing 1.7 billion. In total, you could use about 14 billion to build one nuclear power plant.
Statistics
Nuclear energy accounts for a total of 20% of US energy.
104 Official Nuclear Plants in the US
Most recent in Washington: South from us
Requirements: The main requirement for nuclear plants is water, fresh, freshwater. Water is critical because it is used to moderate a chain reaction, and preventing a meltdown by cooling the fuel elements.