Economic Viability

Economic Viability


How much it costs:


Architecting and Lisccencing = 5%


Porcurment and Construction management = 7%



Construction works: 
  
      Nuclear island 
28% 
      Conventional island 
15% 
      Balance of plant 
18% 
Site development 
20% 
Transportation 
2% 
Commissioning 
5% 
Total 
100% 
  
Equipment 
  
     The nuclear steam supply system 
12% 
     Electrical and generating equipment 
12% 
      equipment 
16% 
     Instrumentation / control system (including software) 
8% 
Construction materials 
12% 
Labor onsite 
25% 
Project management 
10% 
Other services 
2% 
First fuel 
3% 
Total 
100% 

In total, the EPC cost would be about 3.8 billion, while the owner cost would go to over half a billion, and the Financing cost costing 1.7 billion. In total, you could use about 14 billion to build one nuclear power plant. 


Statistics


Nuclear energy accounts for a total of 20% of US energy. 

The MsdfsdsIT Future of Nuclear Study in 2003, increased the estimated prices of new nuclear plants to $2,000/kW, not including financing costs.” 


104 Official Nuclear Plants in the US

Most recent in Washington: South from us


Requirements: The main requirement for nuclear plants is water, fresh, freshwater. Water is critical because it is used to moderate a chain reaction, and preventing a meltdown by cooling the fuel elements.  